T1-11 Siding Installation Instructions
Fit a metal over the top edge of the lower panel.
T1-11 siding installation requires attention to detail, proper planning, and careful execution. By following these installation instructions and guidelines, contractors, builders, and homeowners can ensure a successful installation that provides a durable, attractive, and low-maintenance exterior cladding system. Regular inspections and maintenance can help extend the lifespan of the siding and prevent costly repairs. t1-11 siding installation instructions
Check that the panel is perfectly plumb using a 4-foot level. Fastening Schedule Drive 8d galvanized ring-shank nails along the panel edges. Space edge nails 6 inches apart on-center. Fit a metal over the top edge of the lower panel
[Stud] || [Panel 1]<- 1/8" Gap ->[Panel 2] (Underlap) (Overlap) Use code with caution. Horizontal Stacking Joints Structures taller than 8 feet require vertical stacking. Never overlap T1-11 panels horizontally without flashing. Install wood blocking between studs at the joint line. Regular inspections and maintenance can help extend the
Do not overdrive nails, as puncturing the outer ply ruins the water seal. ↔️ Step 5: Joining Subsequent Panels Vertical Edge Joints
Even if it says "primed," it needs paint.