The alarm stopped blaring, replaced by a nervous hum of the electrical panels. They had survived.
If your utility uses a 30-minute interval, a 10-minute heavy load is averaged down. If they use a 5-minute interval, that same load will cause a higher MD. Know your interval to plan your staggering schedule. electrical maximum demand
Temporarily turn off non-critical loads during your facility's peak period. The alarm stopped blaring, replaced by a nervous
| | Maximum Demand (kW or kVA) | | :--- | :--- | | Total amount of electricity used over a month. | The highest average power drawn at any single moment. | | Billed for what you use . | Billed for the peak rate you use it . | | Analogy: The total gallons of water used. | Analogy: The size of the pipe needed to deliver the water. | If they use a 5-minute interval, that same
"Be careful," Sarah warned. "No big startups while you're down there."
He walked over to a large, red breaker switch labeled .