This section confirms that the stakeholders agree the estimate is realistic before work begins.
| Cost Category | Description | Estimated Cost | | :--- | :--- | :--- | | | Costs directly attributable to the physical build | | | Materials | Lumber, concrete, roofing, siding, hardware. | $______ | | Labor | Wages for carpenters, concrete finishers, general labor. | $______ | | Equipment | Rental of excavators, mixers, power tools. | $______ | | B. Indirect Costs | Costs related to the project management/overhead | | | Permits & Fees | Building permits, inspections. | $______ | | Utilities | Power/water on site during construction. | $______ | | Supervision | Site manager time (pro-rated). | $______ | | C. Contingency | Allowance for unknowns | | | Contingency Reserve | Typically 10-15% of Direct Costs. | $______ | | TOTAL ESTIMATE | Grand Total | $______ | activity 2.2.2 shed cost estimate